PMC Malba
Total Registrations
Total registered vehicle
Total Waste Inflow
Live Fleet Map
2 vehicles liveRegister Certified Vehicle
Active Certified Fleet Registry
| Vehicle Plate | Carrier Company | Driver Name | Telemetry API ID |
|---|
All Requests Master Registry
| Request ID | Site | Tons | Vehicle | Status |
|---|
System Activity Log
System Stakeholder User Directory
| User Name / Agency | System Role | Registered ID | Verification Status |
|---|---|---|---|
| Aditya Builders Corp | Citizen / Builder | PMC-BLD-9982 | Verified |
| Panvel EcoCarriers | Transporter | PMC-TRN-3420 | Verified |
| Namo Swachh Transports | Transporter | PMC-TRN-7419 | Verified |
Transporter License Approvals
| Transporter Entity | Contact | Vehicle | Municipal Status |
|---|---|---|---|
| Sahyadri Carting Co | +91 76543 21098 | MH-06-B-5534 | Fully Licensed |
| Civic Waste Logistics | +91 87654 32109 | MH-46-Z-1045 | Fully Licensed |
Recycling Facility Clearances
| Plant Location / Operator | Processing Capacity | Weighbridge Model | Municipal Clearance |
|---|---|---|---|
| Panvel Municipal C&D Plant (MIDC) | 150 Tons / Day | Avery Weigh-Tronix (Validated) | Active Clearance |
Inbound Weighbridge & Yield Logging
No arrived transporter vehicles currently waiting at the plant weighbridge.
Digital Compliance Clearance
Select and log an arrived vehicle weighbridge receipt to generate certification.
Certified by Avery-Weighbridge Operator: Sanjay Shinde
Landfill Diversion Rate
Carbon Footprint Savings
48.2 Tons CO₂e Prevented
Carbon offsets calculated by tracking truck diesel consumption, route compliance, and aggregate recycling yield efficiency.
Municipal Compliance Reporting
Welcome to PMC Malba
Submit C&D waste pickup requests, track certified transporters, and explore Panvel’s recycling plant and carbon footprint impact.
Recycling Plant
The Panvel Municipal C&D Plant at MIDC Panvel processes concrete, masonry, and soil fractions into reusable aggregate with certified weighbridge clearance.
Carbon Footprint
Track how compliant routing and recycling reduce municipal carbon emissions with PMC Malba.
Submit C&D Waste Pickup Request
Your Requests
Live Tracking Console
AssignedCarrier: -
Driver: -
GPS Telemetry API ID:
-
Recycling Plant
Panvel Municipal C&D Recycling Plant (MIDC Panvel) processes construction debris into certified recycled aggregate with Avery Weigh-Tronix weighbridge validation.
Plant operations overview
- Inbound weighbridge logging for all certified carriers
- Concrete and masonry yield separation
- Digital compliance certificates linked to the PMC Malba dashboard
- GPS-validated route compliance before plant entry
Carbon Footprint
Every compliant C&D trip reduces landfill methane and diesel waste from illegal dumping detours.
How carbon savings are calculated
Offsets combine truck diesel consumption on approved Panvel corridors, prevention of illegal detour dumping, and recycling yield efficiency at the Panvel MIDC plant. Net tonnage × 0.58 estimates CO₂e credit per clearance certificate.
Assigned Logistics Operations
Assignment
No job selectedSelect an assigned logistics operation to view routing and dispatch actions.
Transporter Registration
Register your company and vehicle for PMC Malba certification. Submissions appear under Admin transporter approvals as Pending.
Recycling Plant
Deliver C&D loads only to the Panvel Municipal Plant at MIDC Panvel. GPS must remain active until weighbridge check-in.
Carbon Footprint
Compliant routes and plant delivery cut diesel waste and landfill emissions. Your dispatches contribute to PMC Malba’s 48.2T CO₂e savings.